Material circularity for contractors
Stop paying twice for the same material
TradeMyExcess Circular tracks every unit of surplus from the moment it is identified on site to the project that reuses it, with the carbon and cost evidence to prove what was recovered.
- Hierarchy levels
- 6
- Recovery routes
- 7
- Capture time
- 2 min
Worked scenario
420 m of drainage pipe, Section 52
- 1Site manager logs surplus pipe after a design change.
- 2Classified as reusable and published to the material bank.
- 3A second project 34 km away requests 300 m.
- 4Commercial manager approves and stock is reserved.
- 5Transfer received, procurement avoided and carbon logged.
What the platform covers
Portfolio hierarchy
Group, entity, region, programme, project and site. Every record carries its position in the structure.
Excess capture
Site teams log surplus in under two minutes from a phone, with photographs and quantity evidence.
Internal exchange
A material bank that matches surplus on one project to demand on another before anything is disposed of.
Decision centre
Reuse, redeploy, resell or dispose, ranked by net financial benefit and carbon impact.
Waste compliance
EWC classification, duty of care records and carrier permits held against every movement.
Audit-grade evidence
Immutable audit events, emission factor provenance and value recovery lineage for assurance.
